Author: Rojas Empire Team

  • FIGHT THE URGE TO HIRE CHEAP — HOW ONTARIO REIs SHOULD ACTUALLY CHOOSE THEIR DESIGNER

    FIGHT THE URGE TO HIRE CHEAP — HOW ONTARIO REIs SHOULD ACTUALLY CHOOSE THEIR DESIGNER

    Every week we talk to investors who started their project with the cheapest drafter they could find. Most of them are calling us because something stalled: the drafter stopped answering, the City sent back 30 comments nobody can explain, or the “$500 job” has quietly turned into $4,000 in extras. The drawings were never the expensive part. The delay was.

    This post isn’t about telling you to overpay. It’s about changing the question you ask. Not “who is cheapest?” but “who will get this permit issued, and stay with me until it is?”

    The Drawing Is Not the Product. The Permit Is.

    A set of drawings is just the starting point. What you’re actually buying is a permit in hand, issued without months of back-and-forth, on drawings a contractor can price and build from.

    Between submission and issuance, a lot happens:

    • Examiner comments. Almost every conversion gets at least one round. Someone has to read them, understand the code intent behind them, revise the drawings and respond in writing.
    • Consultant coordination. Structural, HVAC, energy efficiency and sometimes fire protection all have to line up with the architectural drawings. If they don’t, the City catches it.
    • Zoning questions. Parking, unit count, setbacks and lot coverage can all surface mid-review.
    • Phone calls and meetings. Sometimes the fastest fix is a 10-minute conversation with the examiner — if your designer is able and willing to have it.

    The $500 quote usually covers the drawings. It rarely covers any of the above.

    The Real Math: What a Cheap Quote Actually Costs

    Let’s use a simple example. You own a $1.2M property you’re converting to a fourplex, financed at roughly 5%. That’s about $5,000 a month in interest alone — before property tax, insurance, utilities and lost rent.

    Now say your permit takes three extra months because of poor drawings, slow responses and repeated resubmissions. That’s $15,000+ in carrying cost, plus three months of rent you didn’t collect, plus a contractor who may have moved on to another job.

    Saving $2,000 on design fees to lose $20,000 in time is not a saving. It’s the most expensive line item on your project.

    Five Questions to Ask Before You Hire Anyone

    1. Will this person stay through the whole process?

    Permits don’t end at submission. Comments often come back weeks later, and resubmissions can take a few rounds. Ask directly: “Is responding to examiner comments included? How many rounds?” A designer who disappears after submission leaves you holding a file nobody else wants to pick up mid-stream.

    2. Are they easy to reach?

    Call them before you hire them. Email them a question. How long did it take to get an answer? That is exactly how long it will take when the examiner has a question and the clock is running. Responsiveness during the sales process is the best it will ever be.

    3. Can they talk code with the City?

    This is the one most investors never think about. Conversions are full of judgment calls: fire separations, egress, existing conditions, Part 11 compliance alternatives. Examiners respond to designers who understand the code intent and can explain their approach clearly and professionally. A designer who can only redraw what they’re told will revise and resubmit, over and over, until something sticks.

    4. Will the price stay the price?

    Ask for the scope in writing. Specifically, ask whether these are included:

    • Site visit and measured existing drawings
    • Zoning review
    • Responding to examiner comments (and how many rounds)
    • Coordination with engineers and other consultants
    • Revisions you request after the design is approved
    • Calls or meetings with the City

    The cheapest quotes are often cheap because they exclude almost everything on that list. Then the extras start: $300 here for a revision, $500 there for a resubmission. The snowball builds, the relationship sours, and you’re too far in to switch.

    5. Did they give you the full picture — including the other consultants?

    A designer who understands your project will tell you upfront what else you need. Depending on the job, that can include:

    • Structural engineer (beams, removed walls, openings, new loads)
    • HVAC designer (heat loss/gain calculations and duct design for each unit)
    • Energy efficiency compliance (SB-12)
    • Fire protection or sprinkler designer
    • Ontario Land Surveyor (survey or topographic information)
    • Geotechnical engineer, arborist or civil engineer on larger or new-build projects

    If nobody tells you this at the start, you’ll find out from the examiner’s comment letter — after you’ve already lost weeks.

    Verify Before You Sign

    You can check a lot of this yourself in under an hour:

    • Check their qualifications. In Ontario, a designer submitting permit drawings must be qualified (BCIN) or be a licensed architect or engineer. Look them up on the province’s public registry and confirm their category covers your building type — houses, small buildings and large buildings are separate categories.
    • Ask for two or three recent, similar projects in your municipality that reached permit issuance. Not renderings — issued permits.
    • Ask your network. Other investors, contractors and realtors know who answers the phone and who gets permits issued. Reputation in this industry is built project by project, and it travels.

    Red Flags We See All the Time

    • A flat fee with no written scope
    • “Permit guaranteed” or “we know someone at the City”
    • No site visit — they’ll “work from your photos”
    • No mention of engineers or other consultants for a multi-unit conversion
    • They don’t ask about zoning, existing unit status or parking
    • You only ever reach them by text, and only at night

    None of these automatically means bad work. Together, they usually mean a long, expensive permit process.

    How Rojas Empire of Design Approaches This

    We’re not the cheapest option, and we’re upfront about that. Here’s what you get instead:

    • A written scope that spells out what’s included, from site visit to approved permit — including responding to examiner comments.
    • A full consultant breakdown at the start, so you know every engineer and report your project needs before you commit.
    • Experience talking with examiners and inspectors across dozens of Southern Ontario municipalities, so comments get resolved, not just redrawn.
    • One team that stays on your file from the first site visit until we email you the approved permit.

    Final Thoughts

    Choosing a designer is not a purchase. It’s a partnership that lasts months. Make the choice the way you’d make any other investment decision: on track record, communication, scope and references — not on the lowest number in your inbox.

    If you’re comparing quotes right now, send them our way. We’ll walk you through what each one actually includes, even if you don’t end up hiring us.

  • AFTER THE FIRE — WHY YOUR INSURANCE DRAWINGS WON’T GET YOU A BUILDING PERMIT (AND WHAT WILL)

    AFTER THE FIRE — WHY YOUR INSURANCE DRAWINGS WON’T GET YOU A BUILDING PERMIT (AND WHAT WILL)

    Fire and insurance rebuilds have been one of the most common project types we’ve handled this year. The pattern is almost always the same: the insurance process moves, the restoration contractor is ready, and then everything stops at the City. The reason is simple. The drawings prepared for the insurance claim were never designed to get a building permit.

    What Happens After a Fire (In Order)

    1. Fire department and investigation. The fire service secures the scene and, where required, investigates the cause.
    2. The insurer gets involved. An adjuster is assigned, and a restoration contractor typically handles board-up, fencing, water extraction and stabilization.
    3. The City’s building department gets involved. If the building is damaged enough to be a hazard, an inspector can issue an Order to Remedy an Unsafe Building under section 15.9 of the Building Code Act. Where the danger is immediate, an emergency order can be issued under section 15.10.
    4. A permit becomes mandatory. Remedying the unsafe condition almost always involves structural repair, rebuilding fire separations, replacing systems — all work that requires a building permit. Getting that permit is part of complying with the order.

    We’ve written about Orders to Comply before. An unsafe building order is a related but separate tool, and it is treated even more seriously because it’s about life safety. The City expects to see active progress, not a pending claim.

    The Gap: What Insurance Drawings Usually Include (And What They Don’t)

    Insurance drawings are prepared to scope and price the claim. They’re usually drafted to the bare minimum: a floor plan, maybe a few notes, enough for an estimate.

    A building permit needs a lot more. Here’s what’s usually missing:

    • Code analysis. Building classification, fire separations, spatial separation, smoke and CO alarms, egress. The examiner needs to see the building has been reviewed against the OBC, not just redrawn.
    • Fire separation and assembly details. Rated wall and ceiling assemblies, door ratings, closers, penetrations. After a fire, these get extra scrutiny.
    • Structural engineering. Charred joists, rafters, beams and studs need to be assessed by an engineer. Some can be sistered or reinforced; others must be replaced. The City will want stamped structural drawings or a report.
    • HVAC design. Replacing ductwork and equipment generally needs heat loss/gain calculations and duct design by a qualified designer.
    • Energy efficiency (SB-12). When you’re rebuilding walls and ceilings and replacing insulation, the City will ask how the work meets energy efficiency requirements.
    • Sections and details. Wall sections, ceiling assemblies, stair details, guards. Contractors need these to build correctly, and inspectors check against them.
    • Unit and zoning status. Was the building a legal duplex? A legal triplex? Or was there an unpermitted basement unit before the fire? This matters more than most owners expect (see below).

    The Hard Conversation: Illegal Units Before the Fire

    This catches many investors off guard. Your insurance may be set up to restore what existed. The City will only permit what can be legal.

    If the building had an unpermitted basement apartment, a third unit that was never approved, or a layout that never met code, the rebuild is now the moment it gets looked at. You won’t get a permit to recreate an illegal unit. You will need a legalization strategy — fire separations, egress, ceiling heights, zoning permissions — or a different layout.

    The good news: a fire rebuild is often the cheapest time to legalize a unit, because the walls and ceilings are already open. Done right, you can come out of a disaster with a fully legal, more valuable building.

    Part 11 Helps — But It’s Not a Free Pass

    OBC Part 11 (renovation of existing buildings) can allow some existing conditions to remain, and offers compliance alternatives where full new-construction requirements aren’t practical. On fire rebuilds, this can save real money.

    But the more of the building you remove and rebuild, the less “existing” there is to protect. New work is generally expected to meet current requirements. A designer who knows how to argue Part 11 properly — and when not to — makes a big difference here.

    Four Things Owners Should Do Immediately

    • Talk to your broker about code-upgrade coverage. Many policies have a by-law or code-upgrade endorsement that may cover some of the cost of bringing the building up to current code. Find out what you have and what the limits are before the scope is finalized.
    • Get a designated substances survey before demolition. Older homes often contain asbestos and other designated substances. Ontario’s Occupational Health and Safety Act requires owners to identify these before tendering the work.
    • Contact the inspector early. Confirm what they need to see, whether an engineer’s report is required first, and what timeline they expect.
    • Bring the design team in before the restoration contractor finalizes scope. It’s far cheaper to align the claim with the permit drawings now than to fight a change order later.

    What the Restoration Contractor and Adjuster Often Get Wrong

    • Treating the permit as a formality that can be “handled later”
    • Assuming a like-for-like rebuild doesn’t need engineering
    • Starting demolition or reframing before the permit is issued
    • Pricing the claim without code-upgrade items, then fighting over change orders

    None of this is bad intent. Their job is to close the claim. Your job — and ours — is to close the City file.

    How Rojas Empire of Design Helps Fire and Insurance Projects

    • Site visit and measured existing conditions, including documenting the damaged areas.
    • Permit-ready architectural drawings with a full code analysis, fire separation details, sections and notes.
    • Engineering coordination — structural, HVAC and energy efficiency — so the City gets one coordinated package.
    • Unit legality review, so you know upfront whether the pre-fire layout can be permitted or needs a legalization path.
    • Communication with the inspector and examiner, and coordination with your adjuster and restoration contractor on what the permit requires.

    Final Thoughts

    A fire is stressful enough. The permit doesn’t have to be. Insurance drawings get the claim moving; permit drawings get the City order closed and the building occupied again. The sooner those two are aligned, the less time your property sits empty.

    If you’ve had a fire or received an unsafe building order, send us the order and the insurance drawings. We’ll tell you what’s missing and how quickly we can get you to submission.

  • THE 10-UNIT, 3-STOREY NEW BUILD — WHY IT’S BECOMING THE SMARTEST STRATEGY FOR ONTARIO REIs

    THE 10-UNIT, 3-STOREY NEW BUILD — WHY IT’S BECOMING THE SMARTEST STRATEGY FOR ONTARIO REIs

    For years, investors were stuck choosing between a fourplex that doesn’t move the needle and a mid-rise that needs a development team, a decade of patience and a balance sheet to match. The 10-unit, 3-storey building sits in the sweet spot between the two. It’s big enough to change your portfolio, and small enough to design, permit and build without the machinery of a large development.

    Why “10 Units” Is the Magic Number

    Since Bill 23 (2022), the Planning Act exempts residential development of 10 units or fewer from site plan control. There are carve-outs: lands within 120 metres of a shoreline or 300 metres of a railway line can still be pulled back in by the municipality. Outside those areas, a 10-unit residential building generally goes straight from zoning compliance to building permit.

    That’s the single biggest reason this strategy works. Add an 11th unit, and you’re into site plan approval: more consultants, more studies, a site plan agreement, securities and often 6 to 18 months of extra process.

    Why “3 Storeys” Matters Just as Much

    Keep the building to 3 storeys and a building area of 600 m² or less, and it typically falls under OBC Part 9 instead of Part 3. That changes the whole project:

    • Simpler code path. Part 9 is prescriptive and well understood by designers, examiners, inspectors and contractors.
    • Wood-frame construction. Conventional lumber, engineered joists and trusses. Minimal steel — often just a few beams or lintels where spans demand it.
    • No elevator required. A Part 9 residential building of up to 3 storeys generally doesn’t need an elevator. That saves the equipment cost, the shaft and machine space, and years of maintenance and inspection fees. Barrier-free requirements still apply at the entrance level, so plan for them early.
    • A trade base that already exists. Every residential framer, plumber and HVAC contractor in Southern Ontario knows how to build this. You’re not limited to commercial contractors with commercial pricing.
    • Faster permit review. Part 9 buildings generally have shorter legislated review timelines than large Part 3 buildings.

    Slab-on-Grade: The Underrated Cost Saver

    Many of these buildings work best without a basement. Slab-on-grade means:

    • No deep excavation, shoring or large volumes of soil to haul away
    • Less exposure to groundwater, waterproofing failures and sump issues
    • No below-grade units with their light, egress and ceiling height challenges
    • A faster foundation stage, so framing starts sooner

    The trade-off: you give up basement floor area, so mechanical rooms, storage and service space need to be planned above grade. Frost protection and slab insulation need to be detailed properly. For most sites, the savings outweigh what you lose.

    Better Parking Layouts

    Without a basement or underground garage, surface parking is designed around a simple, efficient building footprint. A compact rectangular building leaves cleaner drive aisles, fewer awkward stalls and better snow storage. Many municipalities have also reduced parking minimums in recent years — always check your specific zoning, because it varies a lot.

    How It Stacks Up

    Fourplex10-unit, 3-storey (Part 9)11+ units or Part 3
    Site plan approvalNoGenerally no (outside shoreline/rail areas)Yes
    OBC pathPart 9Part 9Usually Part 3
    ConstructionWood frameWood frame, minimal steelOften steel/concrete, more complex
    Typical approvals before permitZoning, permitZoning, permitZoning, site plan, permit
    Consultant teamSmallModerateLarge
    Income potentialLimitedStrongStrong, but slower to reach

    What This Strategy Doesn’t Avoid

    We’re big believers in this building type, but we won’t oversell it. You still need to plan for:

    • Zoning. Many residential zones don’t permit a 10-unit apartment building as-of-right. A minor variance or zoning by-law amendment may still be needed. Always confirm before you buy.
    • Development charges. New units on a new build generally attract development charges. Some municipalities offer reductions, exemptions or deferrals for certain rental housing — check before you finalize your pro forma.
    • Civil engineering. Grading, drainage, stormwater and servicing still need to be designed, even without site plan approval.
    • Fire department access, barrier-free requirements and exiting. These shape the site layout and the building plan from day one.
    • Sprinklers and fire separations. Not always required at this scale, but sometimes worth including for design flexibility. Decide this early.

    What Investors Get Wrong

    • Buying the land before confirming zoning allows 10 units
    • Designing 11 units “because the lot fits it” and triggering site plan approval
    • Drawing a 4-storey building and pushing the project into Part 3
    • Forgetting the 120 m shoreline / 300 m railway check
    • Underestimating servicing upgrades for water and sewer connections

    How Rojas Empire of Design Helps

    • Feasibility before you buy — zoning, unit count, Part 9 fit, parking and site plan exemption check.
    • Design that stays inside the sweet spot — 10 units, 3 storeys, Part 9, efficient footprint.
    • Full consultant breakdown — structural, civil, HVAC, energy, survey and geotechnical as needed.
    • Permit drawings and examiner coordination through to issued permit.

    Final Thoughts

    The 10-unit, 3-storey building isn’t a loophole. It’s what the current rules are designed to encourage: more housing, built faster, by smaller builders. If you pick the right lot and design it right, it’s one of the strongest risk-adjusted plays available to Ontario investors right now.

    Got a lot in mind? Send us the address. We’ll tell you whether it can support 10 units before you spend a dollar on design.

  • HIDDEN CASH FLOW — CONVERTING GARAGES IN EXISTING APARTMENT BUILDINGS INTO NEW UNITS

    HIDDEN CASH FLOW — CONVERTING GARAGES IN EXISTING APARTMENT BUILDINGS INTO NEW UNITS

    When investors bring us an existing apartment building to review — one they own or one they’re about to buy — one of the first things we look at is the garage. In a lot of older Ontario walk-ups and low-rise buildings, the garages are half-empty, used for storage or rented out for a few dollars a month. That’s prime floor area sitting idle.

    Why Garage Conversions Work So Well

    • The structure already exists. Foundation, walls and roof are there. You’re fitting out a space, not building one.
    • Almost all the work is inside. Typically the only exterior change is replacing the garage door with a wall and a new window (and sometimes an entry door).
    • Existing tenants stay put. Work is contained to the garage area, so the rest of the building keeps operating and collecting rent.
    • Strong unit yield. We can usually get at least a one-bedroom unit out of a single garage bay. Larger or connected garage spaces can be split into multiple units.
    • Faster than new construction. No new foundation, no new building envelope from scratch, and often no site plan approval.

    The First Question: Can Your Parking Handle It?

    This is where the deal is won or lost. Converting a garage does two things to parking at once: it removes parking spaces and it adds units that may need parking.

    We check:

    • How many parking spaces the zoning requires for the existing building
    • How many spaces the new total unit count would require
    • Whether the garage spaces are counted as required parking today
    • How many surface spaces actually exist on site

    The good news: many older buildings were built with more parking than today’s standards require, and many municipalities have reduced their parking minimums. Very often the numbers work. When they don’t, a minor variance is sometimes an option.

    Code Items We Design Around

    A garage is not built like a dwelling unit. These are the items that make or break the conversion:

    • Floor. Garage slabs are usually sloped, uninsulated and lower than the adjacent floor. Most conversions need a new insulated floor build-up, which affects ceiling height.
    • Ceiling height. After the new floor build-up, there must still be enough clear height for a habitable unit.
    • Plumbing. New bathrooms and kitchens need drains, often cut into the existing slab. We confirm the depth and location of the sewer connection early — sometimes a pump is needed.
    • Windows, light and egress. Bedrooms need proper natural light and, in most unsprinklered buildings, an egress window. The garage door opening is often the perfect location.
    • Spatial separation. A new window close to a property line may be limited in size, or may need protection. This must be checked before the layout is fixed.
    • Fire separations. The new unit must be separated from adjacent units, corridors and any remaining garage or service spaces. If some garages remain, gas-tightness between the garage and the unit is critical.
    • Fire alarm and life safety. If the building has a fire alarm system, the new units need to be tied in and verified.
    • HVAC and electrical capacity. We check whether the building’s existing systems can support new units, or whether each unit needs its own.

    Other Things to Know

    • Zoning must permit the extra units. Unit count, density and use permissions all need to line up.
    • Development charges. There’s a limited development charge exemption for adding units to existing rental buildings, but the rules are specific. Confirm with the municipality before you finalize your numbers.
    • Construction still affects tenants. Noise, short service shut-offs and fire alarm work need to be coordinated and communicated.

    What Owners and Contractors Get Wrong

    • Assuming the garage is “just empty space” and skipping the parking analysis
    • Framing a floor over the existing slab without checking the final ceiling height
    • Cutting the slab before confirming where the sewer actually is
    • Installing a large window near a lot line without a spatial separation check
    • Not planning the fire alarm tie-in until the inspector asks

    How Rojas Empire of Design Helps

    • Building assessments for buyers and owners — we review existing apartment buildings and flag conversion potential, including garages, before you commit.
    • Parking and zoning review to confirm the unit increase is supportable.
    • Unit layouts that maximize yield while meeting light, egress, height and separation requirements.
    • Permit drawings and consultant coordination — structural, HVAC, plumbing and fire alarm as needed — through to issued permit.

    Final Thoughts

    The best value-add opportunities are often hiding in plain sight. A garage that brings in nothing today can become a cash-flowing unit tomorrow, with minimal disruption to the tenants who are already there.

    If you own or are looking at an apartment building with garages, send us the address and a few photos. We’ll tell you what the garages could become.

  • TO ONTARIO CONTRACTORS — LET’S BUILD BETTER PROJECTS TOGETHER

    TO ONTARIO CONTRACTORS — LET’S BUILD BETTER PROJECTS TOGETHER

    This one isn’t for investors. It’s for you — the general contractors, framers, renovators and trades who actually turn our drawings into buildings.

    We’ve worked alongside a lot of contractors over the years. The best projects we’ve ever been part of had one thing in common: the designer and the contractor talked to each other early and often. The worst ones had drawings handed over the fence and nobody picking up the phone when questions came up.

    What We Know About Your Side of the Job

    We’re not pretending to know how to swing a hammer better than you. But we do understand what makes your life harder:

    • Drawings that look nice but don’t show how anything actually goes together
    • Details that ignore how trades really sequence the work
    • Designers who disappear after the permit is issued
    • Revisions that show up after you’ve already framed it
    • Clients who think the permit means the hard part is over

    We design with buildability in mind, because a permit that can’t be built efficiently isn’t a win for anybody.

    What We Bring to Your Projects

    • Permit drawings that are buildable. Clear plans, sections and notes that tell your crew what to build — not just what the City needs to see.
    • Full consultant coordination. Structural, HVAC, energy and others, lined up before submission so you’re not chasing engineers mid-job.
    • Examiner and inspector communication. We handle the code conversations during permitting, so you’re not stuck explaining fire separations to an examiner.
    • Experience across Southern Ontario. We’ve worked with dozens of municipalities, and we know how different departments interpret things.
    • Straight answers. If something on the job doesn’t match the drawings, call us. We’d rather solve it in a 10-minute call than a 3-week revision.

    Why This Is Good for Your Business

    You win more jobs. Clients hire contractors who can say, “I already have a design team I trust.” Bringing us in makes your proposal stronger.

    You get cleaner starts. Projects with complete, coordinated drawings start faster and have fewer surprises — and fewer unpaid change orders.

    You get referrals. We work with investors every week who have approved permits and no contractor yet. We regularly connect them with contractors we trust. We’d like you to be one of them.

    What We Ask in Return

    Partnerships go both ways. Here’s what makes us want to refer you again and again:

    • Call before you deviate from the drawings — we’ll find a fix that keeps the inspector happy.
    • Book your inspections on time and tell us when something doesn’t pass.
    • Treat our mutual clients the way you’d want your own family treated.
    • Give us feedback. If a detail was a pain to build, tell us. We’ll improve it.

    Who We’re Looking to Connect With

    • General contractors doing conversions, additions and small multi-unit builds
    • Renovation companies working on investor properties
    • Framers, HVAC contractors, plumbers and electricians who want steady referral work
    • Fire and insurance restoration contractors who need permit drawings fast

    Let’s Talk

    If you’re a contractor working in the GTA, Hamilton, Niagara, Kitchener-Waterloo or anywhere in Southern Ontario, we’d love to hear from you. Tell us what kind of work you do, where you work and what size jobs you like. We’ll tell you how we work, and we’ll keep you in mind the next time a client needs a builder.

    Send us a message, give us a call or connect with us on LinkedIn. Let’s build better projects together.

  • HOW LONG DOES IT REALLY TAKE? REALISTIC PERMIT TIMELINES FOR ONTARIO CONVERSIONS

    HOW LONG DOES IT REALLY TAKE? REALISTIC PERMIT TIMELINES FOR ONTARIO CONVERSIONS

    The most common frustration we hear from investors isn’t about cost. It’s about time. And most of that frustration comes from expectations set by someone who quoted the legislated review period as if it were the whole process.

    This post gives you the real picture, based on what we see on our own projects across the GTA, Hamilton and Southern Ontario.

    First, Understand the “Official” Timeline

    The Ontario Building Code sets review periods for complete permit applications:

    Building typeLegislated review period
    House (no unit stacked above another)10 business days
    Small building (other Part 9, e.g. most stacked triplex/fourplex conversions)15 business days
    Large building (Part 3)20 business days
    Complex building30 business days

    Three things investors need to know about these numbers:

    • The clock starts only when the application is deemed complete. Missing forms, schedules or reports mean the clock hasn’t started.
    • The clock covers the first review only. Once the examiner issues comments, those timeframes no longer apply to your file.
    • It’s 15 business days — not 15 days of design. Everything before submission sits outside that number.

    Timeline A: Typical Triplex or Fourplex Conversion (GTA / Hamilton)

    1. Initial call and proposal — 1 to 3 days. We review the address, zoning and your goals, and send a written scope.
    2. Site visit and building scan — usually within 1 to 2 weeks of signing, depending on tenant access.
    3. Existing (as-built) drawings — 1 to 2 weeks.
    4. Zoning review and feasibility — about 1 week. If a minor variance is needed, add 3 to 6 months here.
    5. Proposed layouts and client approval — 2 to 3 weeks. This depends heavily on how quickly you sign off.
    6. Consultants: structural, HVAC, energy efficiency — 2 to 4 weeks, running alongside the design.
    7. Permit drawings finalized and submitted — about 1 week.
    8. Intake and completeness check — a few days to 2 weeks, depending on the municipality.
    9. First review and comments — legislated 15 business days; in practice, 3 to 8 weeks.
    10. Revisions and resubmission — 2 to 6 weeks per round. Most projects need 1 to 2 rounds.
    11. Fees paid and permit issued — about 1 to 2 weeks.

    Realistic total: about 3 to 6 months from site visit to permit, without a minor variance. Add 3 to 6 months if one is needed.

    Timeline B: Typical Commercial-to-Residential Conversion

    1. Initial call and feasibility discussion — 1 week.
    2. Site visit and building scan — 1 to 2 weeks. Larger buildings may need more than one visit.
    3. Existing drawings — 2 to 4 weeks.
    4. Zoning, use permissions and code strategy — 2 to 4 weeks. Part 3 analysis, exiting, fire separations, sprinkler and fire alarm requirements.
    5. Planning approvals, if needed — this is the big variable:
      • Minor variance: 3 to 6 months
      • Zoning by-law amendment: often 9 to 18 months
      • Site plan approval: often 6 to 18 months
      • Record of Site Condition, where a change to residential triggers one: can add 6 to 12+ months
    6. Design development and client approval — 4 to 8 weeks.
    7. Full consultant team — structural, mechanical, electrical, plumbing, fire protection, fire alarm and energy: 6 to 12 weeks.
    8. Permit submission and completeness check — 1 to 2 weeks.
    9. First review and comments — legislated 20 business days for most Part 3 buildings; in practice, 6 to 12 weeks.
    10. Revisions and resubmission — 4 to 8 weeks per round. Two or three rounds are common.
    11. Permit issued — sometimes in stages (for example, a demolition or interior partial permit first).

    Realistic total: about 6 to 12 months with no planning approvals. Often 12 to 24+ months when planning approvals are needed.

    Why Some Cities Are Slower Than Others

    • Volume. Large municipalities receive thousands of applications. Your file waits in a queue.
    • Staffing. Examiner shortages and turnover slow everything down.
    • Internal circulation. Some cities send files to zoning, engineering, fire and others before or during building review.
    • Local policies. Some municipalities require extra documents at intake that others don’t.

    We’ve worked with dozens of Southern Ontario municipalities, so we build these differences into the timeline we give you upfront.

    What Slows Projects Down (That You Control)

    • Taking weeks to approve layouts
    • Changing the unit count or layout after consultants have started
    • Delaying tenant access for the site visit
    • Not paying consultant retainers on time
    • Starting work before the permit is issued (which can trigger an order and stall everything)

    How Rojas Empire of Design Keeps Timelines Tight

    • A realistic timeline at the start, based on your municipality and building type.
    • Consultants engaged early and coordinated so drawings go in complete.
    • Complete submissions, so the review clock starts on day one.
    • Fast, clear responses to examiner comments, to keep resubmission rounds to a minimum.

    Final Thoughts

    Nobody can make a slow city fast. What you can do is avoid adding your own delays, submit a complete package the first time and plan your financing and tenant timelines around realistic numbers.

    Want a timeline for your specific project? Send us the address and what you’re planning. We’ll map it out step by step.

  • WHAT WE ARE — AND WHAT WE’RE NOT: KITCHENS, INTERIORS AND LANDSCAPING

    WHAT WE ARE — AND WHAT WE’RE NOT: KITCHENS, INTERIORS AND LANDSCAPING

    Every so often, a client gets their permit drawings and asks, “So where are the cabinet elevations?” or “What colour should we paint the living room?” Fair questions — just not for us. Being clear about this upfront saves everyone time, money and frustration.

    What We Do

    Our job is to get your project designed, coordinated and permitted in line with the Ontario Building Code and the local zoning by-law. That means:

    • Unit layouts, room sizes and ceiling heights
    • Fire separations, exits and egress
    • Natural light, ventilation and window requirements
    • Coordinating structural, HVAC, energy and other consultants
    • Preparing permit drawings and working with examiners until the permit is issued

    Everything we draw is driven by one question: does it meet code and get approved?

    We’re Not Kitchen Designers

    For permit purposes, we lay out each kitchen at a basic level. Most importantly, we show the plumbing fixtures, because they affect drainage and venting, and the basic appliance locations.

    From the City’s point of view, a kitchen needs the essentials: a sink, space for a stove and a fridge, and the required exhaust. The City doesn’t review cabinet styles, countertop materials or island shapes.

    What we don’t do:

    • Cabinet layouts, elevations or shop drawings
    • Countertop, backsplash or hardware selections
    • Appliance specifications or finishes

    That’s the kitchen supplier’s job. Once you have our drawings, hand them to your kitchen company. They’ll design the cabinetry within the space we’ve planned. If they want to move the sink or add fixtures, talk to us first — moving plumbing can affect the permit.

    We’re Not Interior Designers

    We design to meet the Building Code. That’s what drives our decisions throughout the process.

    If you’re looking for help with:

    • Paint colours and finishes
    • Flooring, tile and fabric selections
    • Lighting fixtures and decor
    • Furniture layouts and styling

    …that’s the role of an interior designer. They’re great at it, and it’s a different skill set from code-driven building design.

    We’re Not Landscape Designers Either

    We show site information that the permit needs, such as the building footprint, walkways, parking and grading information from the survey or civil engineer.

    We don’t design gardens, planting plans, patios or outdoor living spaces. On projects that require site plan approval, a landscape architect is usually part of the consultant team — we coordinate with them, but we’re not them.

    Why This Matters

    • It keeps our fees focused. You pay for the expertise that gets your permit issued, not for services you could get better elsewhere.
    • It avoids misunderstandings. Knowing what’s included means no surprises when drawings arrive.
    • It gets you better results. Kitchen suppliers, interior designers and landscape designers specialize in exactly what they do.

    We Can Connect You

    While these services aren’t included in our fees, we work with kitchen suppliers, interior designers and landscape professionals we trust. If you need one, just ask — we’re happy to make an introduction.

    Final Thoughts

    Think of us as the team that gets your building legal, safe and permitted. Once the permit is in hand, the people who make it beautiful take it from there.

    Have a project that needs permit drawings? Get in touch, and we’ll walk you through exactly what’s included.

  • LOCAL FIRM VS. OUTSIDE FIRM — DOES IT REALLY MATTER WHERE YOUR DESIGNER IS BASED?

    LOCAL FIRM VS. OUTSIDE FIRM — DOES IT REALLY MATTER WHERE YOUR DESIGNER IS BASED?

    One of the questions we get most from investors buying outside their home market is: “Should I hire someone local?” It’s a good question. The honest answer is that location matters less than municipal experience — but it does matter.

    The Case for a Local Firm

    Pros:

    • Knows the local zoning by-law. Every municipality writes its zoning differently, and local firms read it every day.
    • Knows the people. Long relationships with local examiners and planners can make conversations easier.
    • Easy site access. Site visits, follow-up measurements and quick site checks are simple.
    • Knows local quirks. Intake requirements, preferred drawing formats and unwritten expectations.

    Cons:

    • Narrower perspective. A firm that only works in one city may not know solutions other municipalities already accept.
    • Limited choice. In smaller markets, there may be only a few local options, and they’re often booked up.
    • Not always the right fit. Local doesn’t automatically mean experienced in your building type, like multiplex conversions or commercial-to-residential.

    The Case for an Outside Firm

    Pros:

    • Broader experience. Firms that work across many municipalities see more project types and more ways of solving problems.
    • Specialization. You can pick a firm that focuses on exactly what you’re doing — conversions, multiplex, fire rebuilds — instead of whoever is closest.
    • One team for your portfolio. If you invest in several cities, one firm across all of them means consistent quality and communication.

    Cons:

    • May not know the local by-law. A firm unfamiliar with a municipality can miss zoning details that a local firm would catch.
    • Travel time. Site visits take longer to schedule and can cost more.
    • Unknown to local staff. There’s no existing relationship with the examiners.

    The Real Question: Has This Firm Worked in Your Municipality?

    The line between “local” and “outside” matters less than this: has the firm actually taken permits through your municipality, for your type of project?

    A firm based two cities away that has done 30 conversions in your municipality is more “local” in the ways that count than a firm down the street that has never done one.

    Ask:

    • How many projects have you done in this municipality?
    • What’s the review timeline really like there right now?
    • What do their examiners typically comment on for this type of project?
    • How quickly can you get to site?

    Our Approach: Regional Experience, Local Knowledge

    We’ve spent nearly a decade working across Southern Ontario, on projects in dozens of municipalities — from Toronto, Mississauga and Brampton, to Hamilton, Burlington and Oakville, to Niagara, Kitchener-Waterloo and London, north to Barrie and Collingwood, and west to Chatham-Kent.

    That gives our clients the best of both:

    • Local knowledge of how each municipality reviews and approves projects
    • Regional perspective on what works across different cities and building types
    • One consistent team for investors with properties in more than one city
    • Site visits across the region, scheduled around your timeline and tenant access

    Final Thoughts

    Don’t choose a designer based only on their postal code. Choose based on proven experience in your municipality and with your project type, plus how well they communicate.

    Investing in a city you don’t know well? Send us the address. We’ll tell you what we’ve seen there and what to expect.

  • SITE PLAN APPROVAL IN ONTARIO — WHAT REIs SHOULD REALISTICALLY EXPECT

    SITE PLAN APPROVAL IN ONTARIO — WHAT REIs SHOULD REALISTICALLY EXPECT

    Site plan approval (SPA) is where many investors get their first real taste of the planning process — and where many timelines fall apart. It’s not a building permit, and it’s not zoning. It’s a separate approval that controls how your building sits on the site and how the site works.

    When Do You Need Site Plan Approval?

    Site plan control applies to areas a municipality designates in its site plan control by-law. For residential projects, the key rules are:

    • 10 residential units or fewer: generally exempt since Bill 23 (2022) — unless any part of the land is within 120 m of a shoreline or 300 m of a railway line.
    • 11 or more units: generally subject to site plan control.
    • Mixed-use and commercial projects: often subject, depending on the municipality’s by-law.

    Always confirm with the municipality. Their by-law and the provincial rules both apply.

    What Site Plan Reviews (And What It Doesn’t)

    SPA looks at the site and how it functions: building location, access and driveways, parking and loading, grading and drainage, stormwater management, servicing, garbage storage and collection, fire access, lighting, landscaping and walkways.

    Since Bill 23, municipalities have more limited power to control the exterior design and architectural details of residential buildings through site plan. In practice, expect fewer architectural style comments — but just as much engineering scrutiny.

    Your Typical Site Plan Team

    ConsultantWhat they do
    Architect / designer (that’s us)Site plan, building plans and elevations, coordinates the team
    PlannerPlanning strategy and any planning reports (more common if zoning relief is also needed)
    Civil engineerGrading, servicing, stormwater management, functional servicing report
    Ontario Land SurveyorBoundary and topographic survey
    Landscape architectLandscape plan, tree planting, buffering
    ArboristTree inventory and preservation plan
    Traffic / transportation engineerTraffic impact or parking study, where required
    Geotechnical engineerSoils report
    Environmental consultantPhase One ESA (and Phase Two, if needed)
    Noise / acoustic consultantNoise study near major roads, rail or industry
    Electrical / lightingPhotometric plan, where required

    Not every project needs every consultant. The municipality’s checklist decides — which is why a good pre-consultation matters.

    The Process, Step by Step

    1. Pre-consultation (optional, but recommended). Since Bill 185 (2024), municipalities can no longer make pre-consultation mandatory. We still recommend it: it tells you exactly which studies the City expects, so your application isn’t deemed incomplete.
    2. Prepare the submission. Drawings, reports and studies from the full team. Typically 2 to 4 months.
    3. Formal application and completeness review. The City confirms everything required is included.
    4. Circulation. The application goes to planning, engineering, transportation, forestry, fire, waste, the conservation authority and others.
    5. First comments. Often 6 to 12 weeks after submission.
    6. Resubmissions. Two or three rounds are common, each taking 4 to 8 weeks between our revisions and the City’s re-review.
    7. Approval and site plan agreement. Many municipalities require a site plan agreement registered on title.
    8. Securities and fees. Letters of credit or cash securities for site works, plus fees, are usually required before final approval.
    9. Building permit. Many municipalities won’t issue a building permit until site plan approval is in place.

    The Realistic Timeline

    The Planning Act gives municipalities 60 days to decide on a complete site plan application. If they don’t, the applicant can appeal to the Ontario Land Tribunal.

    In practice, appeals for non-decision are rarely the fastest route. And since Bill 185 repealed the fee refund rules, there’s less financial pressure on municipalities to hit that 60-day mark.

    Realistic expectation: 6 to 18 months from pre-consultation to approval, depending on the municipality, the site and how complete your first submission is.

    What REIs Get Wrong

    • Not budgeting for the full consultant team and securities
    • Skipping pre-consultation and getting an incomplete application notice
    • Waiting on one consultant who holds up the whole resubmission
    • Assuming site plan approval means the building permit is approved too
    • Designing an 11th unit without realizing it triggers site plan control

    How Rojas Empire of Design Helps

    We start small, so you don’t spend big before you know. Before you hire anyone else, we prepare schematic drawings — a site plan, floor plans and elevations — and take them to a pre-consultation meeting with the City. The goal is to find out exactly what the City is looking for and what its main concerns are with your proposal.

    That meeting produces the City’s list of required studies and its key concerns. If that list is manageable, you move forward with a clear scope for every consultant. If it’s too much — too many studies, too many costs, too much risk — you can walk away, having only paid for the architectural side instead of a full consultant team.

    From there, we help with:

    • Feasibility first — is SPA needed, and is there a smarter path (like staying at 10 units)?
    • Consultant team assembly and coordination, once you decide to proceed, with a full fee and scope breakdown upfront.
    • Complete, coordinated submissions to reduce resubmission rounds.
    • Managing City comments across disciplines until approval.
    • A seamless transition from site plan approval into the building permit.

    Final Thoughts

    Site plan approval is manageable when you go in with the right team, a complete package and realistic expectations. It becomes painful when you go in expecting 60 days.

    Thinking about a project that may need site plan approval? Send us the address and unit count. We’ll tell you whether it’s required and what your team should look like.

  • MINOR VARIANCE IN ONTARIO — WHAT IT IS, WHAT IT ISN’T AND HOW TO GIVE YOUR APPLICATION THE BEST SHOT

    MINOR VARIANCE IN ONTARIO — WHAT IT IS, WHAT IT ISN’T AND HOW TO GIVE YOUR APPLICATION THE BEST SHOT

    Minor variances come up on a lot of our investor projects: a setback that’s a little short, a lot coverage that’s slightly over, a parking count that doesn’t quite work. The process is very manageable — if you understand what it’s for and how the hearing actually plays out.

    What a Minor Variance Is

    A minor variance is permission to depart slightly from the requirements of your municipality’s zoning by-law. It’s granted by the Committee of Adjustment (the CofA), a local committee of appointed members.

    Typical examples:

    • Reduced side or rear yard setbacks
    • Increased lot coverage or floor area
    • Reduced parking spaces
    • Increased building height or depth
    • Reduced landscaped open space

    What a Minor Variance Is NOT

    This is the most common misunderstanding we see. A minor variance only deals with zoning. It does not deal with the Ontario Building Code.

    If your issue is a Building Code issue — ceiling height, fire separation, egress, spatial separation — the Committee of Adjustment can’t help you. Those are handled through the building permit process, often with an alternative solution: a proposal that shows your design achieves at least the same level of performance as the Code requirement. Alternative solutions are reviewed by the building department, not the CofA.

    Zoning issue → minor variance. Building Code issue → alternative solution (or redesign).

    The Four Tests

    Under the Planning Act, the Committee must be satisfied that the variance:

    1. Is minor
    2. Is desirable for the appropriate development or use of the land
    3. Maintains the general intent and purpose of the official plan
    4. Maintains the general intent and purpose of the zoning by-law

    “Minor” isn’t only about numbers. A small variance with a big impact can be refused; a larger variance with little impact can be approved.

    How the Process Works

    1. Zoning review. Confirm exactly which variances you need. Missing one means another application later.
    2. Application. Drawings, forms, fees and sometimes a planning letter are submitted to the Committee.
    3. Circulation and notice. The City circulates your application to departments and agencies. Neighbours within a set distance (usually 60 metres) are notified, and a sign may need to be posted.
    4. Staff report. The City planner prepares a report recommending approval, refusal or conditions. This often comes out just a few days before the hearing — sometimes the day before.
    5. Hearing. You (or your agent) present the application. Neighbours can speak or submit comments. The Committee decides.
    6. Decision and appeal period. A written decision follows, with a 20-day appeal period before it becomes final.

    Realistic timeline: 2 to 4 months from application to decision in most municipalities, plus the 20-day appeal period.

    Why the City Planner’s Support Matters So Much

    The Committee isn’t bound by the staff report, but it carries a lot of weight. An application with the planner’s support is in a much stronger position.

    That’s why we recommend:

    • Talking to planning staff before you apply, where the municipality allows it
    • Keeping variances as small as possible — ask only for what you need
    • Showing you’ve addressed their concerns (privacy, drainage, massing, parking)
    • Being ready to revise if the planner suggests reasonable changes

    If the Planner Doesn’t Support You: The Deferral Option

    Because staff reports often arrive just before the hearing, you may learn the City doesn’t support you only days in advance. You don’t have to go ahead and risk a refusal.

    At the hearing (or before it), you can ask the Committee for a deferral to a later meeting. That gives you time to meet with the planner, revise the proposal and come back with their support. Deferrals often come with an extra fee and add a month or more, but that’s far better than a refusal on the record.

    What Happens If You’re Refused

    If the Committee refuses your application, you can appeal to the Ontario Land Tribunal (OLT) within 20 days of the decision. (In Toronto, minor variance appeals go to the Toronto Local Appeal Body.)

    Appeals take time, cost money and usually need a land use planner and sometimes a lawyer. They’re worth it when you have a strong planning case — not as a reflex.

    One important change: since Bill 23 (2022), neighbours and ratepayer groups can no longer appeal a minor variance decision. Only the applicant, the municipality, the Minister, “specified persons” (like utilities) and public bodies can. Neighbours can still oppose your application at the hearing, though, so they still matter.

    Other Things Our Clients Should Know

    • Neighbours matter. Speaking with neighbours before the hearing can turn opposition into support.
    • Conditions are common. Approvals may come with conditions you must satisfy before a permit is issued.
    • Decisions can lapse. Some approvals have time limits. Don’t sit on them.
    • Check for as-of-right options first. Recent provincial changes allow some small zoning deviations without a variance in certain cases. Always ask before applying.
    • Your building permit waits. You generally can’t get a building permit for work that relies on a variance until the decision is final and binding.

    How Rojas Empire of Design Helps

    • Zoning review to identify every variance before you apply
    • Drawings for the application package prepared for the Committee
    • Revised drawings if the planner requests changes or you choose to defer
    • Referrals to land use planners for representation, and to lawyers if an appeal is needed

    Please note: we do not represent clients at Committee of Adjustment hearings or file applications on their behalf. You can represent yourself at the hearing, or hire a land use planner to prepare the application, speak with staff and represent you. On applications where the planner’s support is uncertain, we strongly recommend hiring one.

    Final Thoughts

    Minor variances are routine, but they’re not automatic. Get your variances right, get staff on side and know when to defer. And remember: if it’s a Building Code problem, a variance won’t fix it.

    Not sure whether you need a variance or an alternative solution? Send us the details. We’ll tell you which route applies.